With a new wing being built in line with its expansion plans, this Canadian hospital had to serve an additional load of 8 MMBtu/hr.
The implemented solution achieved a seasonal efficiency of 95%, reduced natural gas consumption to 82,449,000 ft3 per year, delivered annual savings of $295,700, and resulted in a payback period of less than one year.
With the considered alternative solution to install a fourth boiler, the existing boilers would have continued to operate at a seasonal efficiency of 70% (28% less than the Hybrid FLU-ACE), with an annual forecasted natural gas consumption of 112,286,000 ft3 (36% more than the Hybrid FLU-ACE)
Technical Services Manager reported,
An ambitious energy saving program was proposed consisting of a $1,000,000 investment in modernizing our electromechanical systems, in the hopes of saving $300,000 per year on natural gas and electricity. Under this program, we acquired a hybrid direct contact water heater with a capacity of 10,000,000 BTU/hr. This type of water heater contributed greatly to the achievement of our energy saving objectives. The water heater’s energy performance and great reliability led me to recommend this product without hesitation.
Explore More Hybrid FLU-ACE Case Studies
Speak to our team
Use the form to discuss solutions designed to reduce fuel consumption, improve boiler efficiency, and deliver measurable operating cost savings.