Overview
A renowned art institution required a solution to improve the efficiency of its central boiler plant. The HeatSponge’s modular design provided the flexibility needed to accommodate the severe space limitations above the boilers. At the time of installation, annual fuel savings of more than $90,000 USD enabled the project to qualify for a utility-sponsored energy efficiency rebate, reducing the simple payback period from less than three years to roughly one year.
Having been in reliable service for more than a decade, this installation remains a proven example of how advanced economiser technology can deliver lasting technical, financial, and environmental benefits in facilities with highly constrained space and critical operational requirements.
This project achieved:
- Annual natural gas savings: Over 311,000 m³
- Annual fuel savings: Over $90,000 USD
- Utility-sponsored energy efficiency rebate: Over $154,000 USD
- Payback: ~1 year with energy efficiency rebate
- No ASME code welding required
Working closely with the museum’s representatives, engineers custom-designed a horizontal gas flow that maintained performance while fitting within the tight spatial constraints. Accommodating equipment of this scale under such conditions required careful planning and coordination to ensure the boilers remained in continuous operation, a process described by installation teams as “like building a ship in a bottle.”
Designed for maximum heat recovery, the HeatSponge can be maintained directly by plant personnel without outside assistance. A project engineer remarked on the superior design of the economisers, noting that the tube elements can be individually removed and replaced without welding. Each tube connects through a simple compression fitting, making maintenance straightforward and efficient.
A representative of the museum’s professional association remarked,
…It is rare that a project meets so many important goals. We have reduced the amount of energy we need to consume in our operations, and at the same time generating significant cost savings. We have reduced our carbon footprint and have contributed to a greener [city]…
The rebate programme representative noted that the project was among the largest economiser installations supported through the initiative, highlighting its significance and potential to encourage broader adoption of waste heat recovery technology.
They added that the rebates enabled the art institution to secure immediate approval for project funding, since the proposal not only met but exceeded standard payback requirements, eliminating the need to move through the usual capital budget request process.
Having been in reliable service for more than a decade, the economisers have demonstrated long-term durability and consistent efficiency gains. They have reduced fuel use and proven the lasting value of a flexible, serviceable economiser design in a facility with highly constrained space and critical environmental requirements.
Explore More HeatSponge Case Studies
Speak to our team
Use the form to discuss heat recovery solutions designed to reduce fuel consumption, improve boiler efficiency, and deliver measurable operating cost savings in industrial and institutional facilities.